Class I, Division 1 and Division 2 installation coordination where required
Fuel-center electrical
Industrial-grade execution for the retail forecourt.
Power, controls, communications, hazardous-location wiring methods, and site systems coordinated for demanding fuel-center construction.
Discuss a ProjectForecourt expertise
Specialized systems. One coordinated installation.
Fuel centers combine commercial buildings with industrial-style site infrastructure and classified-location requirements. Sagetech coordinates the store, canopy, dispensers, fuel equipment, communications, emergency controls, and site distribution to the project documents, equipment requirements, applicable codes, and authority having jurisdiction.
PVC-coated rigid conduit and corrosion-resistant raceway systems
Explosionproof fittings, seals, boxes, and equipment connections
Dispenser power, emergency controls, and disconnect systems
Category 6, Ethernet, two-wire, and RS-485 communications
Fuel controllers, back-room equipment, and forecourt interfaces
Canopy lighting, signage, site power, and equipment circuits
Grounding, bonding, testing, startup, and closeout coordination
Fuel-center work
Built for the store, canopy, and forecourt.
Sagetech project photography for this service is being prepared.
Planning a fuel-center project?
Bring the forecourt and building scope together.
Talk with Sagetech about the site plan, equipment package, communications, classified areas, and construction schedule.
Start a Conversation